Full System Design & Installation
Joined-up design for homes moving beyond piecemeal upgrades.
For renovations and ambitious retrofit projects, we bring together heating, hot water and controls into one coherent plan.
Installation process
- Typical installation takes around 4-5 days.
- Day 1-2: install heat pump, primary pipework, and hot water cylinder.
- Day 2-4: radiator upgrades or replacements if required.
- Day 4-5: system commissioning, testing, and controls setup.
- Hot water may be off for up to 2-3 days maximum during installation.
- Follow-up check around 1 week after installation by phone with remote monitoring or in person.
Next Step
Need the whole system to be designed properly from day one?
That is exactly where COMPASS fits best.
